Thursday, September 16, 2010

Pictures of the bedroom floor platform, and the three knee walls



Next up goes the bathroom walls along that flat strapping you see anchored to the floor joists there. It is for the sub flooring to rest on as it runs around the walls. Normally one would put the sub floor down and then build the walls on top right? Well, for this trailer the total skeleton being anchored together adds greater wracking stability.. and we also don't have the sub floor materiel yet. We are going to use plastic honey comb paneling, super light weight and super strong, it's the kind of thing they use in airplane structures.
Here is a shot of the bathroom wall components laid out and ready to be assembled!
Ahh tomorrow!