Since I am kind-a not able to hold anything with my hands ( I tried to assemble the horizontal sills, holding the drill with my injured hand, and it slipped and I drilled into the top of my right foot) I did all the cutting for the assembly pieces, and then I got to play farkie to Scott while he assembled the back wall. It's almost done! I'll post more pictures when we get the windows in.
🌈🌻✌💗⚡"A life lived from tomorrow never comes, a life lived for yesterday never changes, but a life lived for today is full of wonder, mystery and the choice to live happily ever after moment by moment" - Mastin Kipp ⚡💗✌🌻🌈Peace, Love and Power
Wednesday, September 22, 2010
Building the bay window back wall of the TRLR
Since I am kind-a not able to hold anything with my hands ( I tried to assemble the horizontal sills, holding the drill with my injured hand, and it slipped and I drilled into the top of my right foot) I did all the cutting for the assembly pieces, and then I got to play farkie to Scott while he assembled the back wall. It's almost done! I'll post more pictures when we get the windows in.
Subscribe to:
Post Comments (Atom)
Installing those must have difficult. But great job. Waiting to see the photos when your work is completed.
ReplyDeleteSolar powered windows